LGIRS26168 Earthworks for Abandoned Shafts - Yalgoo Phase 1
Binthart Resources Pty Ltd
Awarded by Department of Mines, Petroleum and Exploration
Contract Details
- Reference
- LGIRS261648
- Jurisdiction
- WA
- Financial Year
- FY27
- Category
- Uncategorised
Description
The Department of Mines, Petroleum and Exploration (the Department) is seeking to engage a suitably qualified Principal Contractor to deliver earthworks and construction services under the Abandoned Mines Program (AMP) in Yalgoo, Western Australia. The Contractor will be responsible for undertaking rehabilitation and associated construction activities for abandoned mine features where the scope of works includes: Backfilling of mine shafts, including the loading, haulage, and placement of suitable fill material Collapsing and stabilisation of overhanging ground and unsafe material Installation of geotextile materials where required Removal and lawful disposal of unsuitable or unwanted material from within mine shafts Batter slope stabilisation of abandoned open pits and voids Concrete formwork and associated construction works Geotechnical investigations and rehabilitation design options were previously completed under Contract DEMIRS24473 – Geotechnical Engineering Services for Abandoned Mine Features, Yalgoo Phase 1 . These investigations and methodologiey recomendatrions were finalised in 2025, where the designs were further refined following extensive stakeholder consultation. The Contractor will assume full responsibility as Principal Contractor for the management and control of the site. This includes the provision of all supervision, labour, plant, equipment, and materials necessary to safely and effectively deliver the works in accordance with the Scope of Works, Technical Specifications, and Issued-for-Construction Drawings. This Request consists of the following documents: a. LGIRS26168 - Earthworks for Abandoned Shafts - Yalgoo - Phase 1 - Request for Tender; b. LGIRS26168 - Appendix 1 - PRICE SCHEDULE; c. LGIRS26168 - Appendix 2 - WORK HEALTH AND SAFETY CHECKLIST; d. Attachment 1 - AS 4000-2025 General Conditions of Contract; e. Attachment 2 - LGIRS26168 Scope of Works; f. Attachment 3_ LGIRS26168 _11715-G-S-001-1 Construction Specifications -Part 1; g. Attachment 3_ LGIRS26168 _11715-G-S-001-1 Construction Specifications -Part 2; h. Attachment 4 - LGIRS26168 Drawings Sets 11715 Part 1; i. Attachment 4 - LGIRS26168 Drawings Sets 11715 Part 2; j. Attachment 5_ LGIRS26168 Contractors Record of Evidence; k. Attachment 6_ LGIRS26168 Figures; l. Attachment 7_ LGIRS26168 Potential Aboriginal Heritage Site Discovery Procedure; and m. LGIRS26168 - Earthworks Shape Files.
Key Dates
- Publish Date
- 29 Sept 2026
- Effective Date
- 29 Sept 2026
- End Date
- 31 May 2027
Published fields
- Procurement method
- Limited Sourcing
- Location
- Not published in this source
- Disclosure
- WA contract award published on Tenders WA under Procurement Rule D8.1 (typically $50,000+). Not a complete record of WA spend: CUA call-offs are often unpublished.
Supplier
Binthart Resources Pty Ltd
- ABN
- Not published in this source
Notice ID LGIRS261648