Description
RoadTek is seeking offers for the provision of Water Main & Sewer Construction Civil Works.
The works are required in advance of the reconstruction & upgrade of Walker Street & Bruce Highway Intersection in Maryborough.
As The completion is essential to allow the upgrade to proceed. The works include Supply, install, relocate, test, commissioning and the removal and disposal of redundant water main.
Works by Offeror:
Undertake the works as detailed and in accordance with the plan in Attachment C – Prelim Drawings Water Main & Sewer extract.
All work associated with the Offer shall be performed in accordance with the following Specifications.
MRS170 Public Utilities in Road Projects Site Works (07/25)
MRTS03 (03/25) Drainage, Retaining Structures and Protective Treatments.
MRS03 (03/25) Drainage, retaining structures and protective treatments.
MRTS04(03/25) General Earthworks
MRS04 (03/25) General Earthworks
A copy of this specification is available from www.tmr.qld.gov.au or by contacting the project manager.
In addition, the water mains must be installed in accordance with WSAA water code and its associated drawings.
Details
- Reference
- VP529823
- Agency
- Department of Transport and Main Roads - RoadTek
- Type
- Closes
- Friday 13 November 2026 at 02:00 am
- Multi-agency
- No
- Panel Arrangement
- No
- Multi-stage